I will create an electrical pm schedule and report
Chief Engineer Electrical
About this Gig
Is your electrical maintenance running on memory and guesswork instead of a structured, audit-ready system? Do you need a professional PM schedule that your team can actually follow and that satisfies management and safety audits at the same time?
I am a Deputy Chief Engineer (Electrical) with 13+ years of hands-on industrial electrical engineering experience across Chemical Industries, manufacturing, multinational company, and high-voltage substation projects. I personally design, manage, and report PM programs covering hundreds of electrical equipment items motors, drives, transformers, switchgear, protection relays, UPS systems, and more. What I deliver is not a generic template it is the exact system I use in a real, operating industrial plant.
Why choose me?
I have built and actively maintain PM schedules covering 200+ electrical equipment items across multiple plant phases substations, MV/LV panels, motors, VFDs, protection relays, earthing systems, UPS, and emergency lighting. I have presented these reports directly to senior management and used them to pass annual electrical safety audits. You will receive the same standard of work, customized for your facility.
My Portfolio
FAQ
Can you build this for a non-electrical department (mechanical, utilities, civil)?
My core expertise is electrical systems. For mechanical or utilities equipment, I can include them if you provide the task list — I will format and integrate everything into one unified workbook.
I already have a partial PM schedule. Can you improve it?
Absolutely. Send me your existing file and I will review it free of charge before you order, then recommend which package fits.
Can the Excel file work without VBA or macros?
Yes — the Basic and Standard packages are 100% formula-based with no macros, so they work on any version of Excel including Office 365 online.
Is this suitable for a safety or ISO audit?
Yes. The Standard and Premium packages are structured to meet the documentation requirements typically expected in ISO 55001 asset management and IEC-aligned electrical safety audit frameworks.
Can you add a signature column for physical sign-off?
Yes, this is included by default in all packages. The Premium package also has a digital username capture via VBA for facilities using shared computers or workstations.
