I will develop microsoft powerapps canvas app and power automate for your business


About this gig
I build Microsoft Power Apps canvas apps and Power Automate workflows that replace spreadsheets, paper forms and manual approvals.
WHAT I BUILD
Canvas apps for mobile, tablet and desktop
Inspection forms, timesheets, inventory, asset tracking, approvals, job tracking
Power Automate: approvals, Teams and email alerts, PDF generation, scheduled jobs
Data: SharePoint, Dataverse, Excel, SQL Server, plus custom connectors to any REST API
WHY ME
Real Power Fx, not templates. Clean, delegable formulas that don't break at 500 rows
Production Power Platform experience, including custom connectors and Swagger definitions
You get the .msapp, solution package, setup instructions and a walkthrough video
HOW IT WORKS
Step 1: Send me your process or a sample of your data
Step 2: I confirm scope, screens and cost before you order
Step 3: Build, review, revise, hand over
Licensing, delegation limits and connector costs get flagged upfront, not after you've paid.
Message me before ordering and I'll tell you straight whether Power Apps is the right tool for your problem.
Not sure of scope yet? Start with the Discovery Call package.
Get to know Robin
We help SMB increase their sales!
- FromPakistan
- Member sinceNov 2021
- Avg. response time1 hour
- Last delivery1 year
Languages
English
FAQ
Do you provide source files?
Yes. With the Standard and Premium build packages you get the .msapp file, an exportable solution package and written import instructions, so you are never locked to me.
Can you work with our existing SharePoint/Dataverse?
Yes, provide access or a sample dataset and I’ll connect and test.
What if my license is an issue?
I’ll advise on license implications (some Dataverse/connector features may need specific Microsoft 365 / Power Platform licensing).
Do you create model-driven apps?
Yes, message me first for requirements.
How long does a Power Apps build take?
A single-screen app on one data source is usually 3-5 days. A multi-screen app with approvals and integrations is 2-4 weeks. You get a firm date and scope in writing before you order.
Will the app work on phones and tablets?
Yes. I build responsive layouts and test on phone, tablet and desktop before handover, so field staff can use it offline-tolerant on mobile and office staff get the full screen.
What do you need from me to start?
Your current process (a spreadsheet, a screenshot or a short description), a sample of your data, and a Power Platform environment I can build in. No environment yet? I will walk you through setting one up.
What is the Discovery Call package?
A paid 1-hour session where we map your process, screens, data model and integrations. You get a written scope and a fixed quote for the build, so there are no surprises later. Order the build separately once you are happy.

