I will program troubleshoot and optimize your knx ets6 automation project
AI Automation, Custom Software and AV Systems
About this Gig
I provide professional KNX ETS6 programming, troubleshooting and building automation project support.
My experience includes KNX installations, lighting control, DALI integration, group addresses, actuators, scene configuration and technical commissioning.
SERVICES:
KNX ETS6 project review
KNX programming and configuration
Group address organization
Lighting and dimming control
Scene configuration
Actuator and sensor troubleshooting
KNX project optimization
Technical documentation
Commissioning and testing plans
Integration planning for DALI and Gira X1
PACKAGES:
Basic: Review one defined issue and provide a diagnosis.
Standard: Configure a small existing ETS6 project within the package limits.
Premium: Audit and optimize a larger defined project, with documentation.
IMPORTANT:
Offline programming does not include downloading changes to a live installation.
Remote commissioning, KNX Secure, Gira X1 programming and complex DALI integration require a separate agreed scope.
Please contact me before ordering complex projects.
Device:
Laptop
•
Server
Operating system:
Windows
FAQ
Can you work with existing ETS6 projects?
Yes. I can review and modify existing ETS6 projects when the client provides an accessible project file and the required device information.
Do you provide the modified ETS project?
Standard and Premium include the modified project file within the agreed scope, together with a summary of changes.
Can you fix KNX problems remotely?
Many configuration problems can be investigated offline. Live troubleshooting requires authorised access, suitable diagnostic tools and, when necessary, assistance from an installer on site.
Can you integrate DALI, Gira X1 or Crestron?
Yes, depending on the equipment and requirements. These integrations are quoted separately unless explicitly included in the agreed project.
Do you guarantee that the installation will work?
I verify the configuration within the available project information. Final operation must be tested on the physical installation. Hardware faults and site conditions cannot be guaranteed through offline programming.

