I will be your construction estimator, material takeoff, costing, bid proposal

Philippines

I speak English, Tagalog, Malay

310 orders completed

I do my work with passion and sincerity

I currently work as a Freelancer--Virtual Construction Project Coordinator, Research Analyst and QMS/IMS Specialist. I've completed hundreds of research works covering various industry globally (niche...

Level 2

Has met high performance criteria and has a proven track record for meeting client expectations.

About this Gig

Every contractor has lost money on a job because of a takeoff error. The difference between profitable contractors and struggling ones often comes down to estimating discipline catching the mistakes before they hit your bank account.


THE REASON I AM HERE TO FIX AND AVOID THIS!


Here are the five most common takeoff mistakes that can be avoided.


1. Forgetting the Waste Factor

This is the single most common takeoff error. You calculate the exact theoretical quantity, order exactly that much, and then discover on the job site that you're short. Every material has waste. Include this on your estimates.


2. Wrong Unit Conversions

Mixing up units is embarrassingly easy and devastatingly expensive.


3. Missing Accessories and Fasteners

You calculated the main material perfectly, but forgot everything that goes with it.


4. Ignoring Mobilization Costs

Getting to the job costs money. Setting up costs money. These are real expenses that must be in your bid.


5. Using Old Pricing

Construction material prices are volatile. Lumber, concrete, and steel can swing 1030% in a matter of months. Always check the latest market price.

Domain:

Data

Industry:

Construction

Engineering

Language:

English