I will be your construction estimator, material takeoff, costing, bid proposal
I do my work with passion and sincerity
Level 2
Has met high performance criteria and has a proven track record for meeting client expectations.
About this Gig
Every contractor has lost money on a job because of a takeoff error. The difference between profitable contractors and struggling ones often comes down to estimating discipline catching the mistakes before they hit your bank account.
THE REASON I AM HERE TO FIX AND AVOID THIS!
Here are the five most common takeoff mistakes that can be avoided.
1. Forgetting the Waste Factor
This is the single most common takeoff error. You calculate the exact theoretical quantity, order exactly that much, and then discover on the job site that you're short. Every material has waste. Include this on your estimates.
2. Wrong Unit Conversions
Mixing up units is embarrassingly easy and devastatingly expensive.
3. Missing Accessories and Fasteners
You calculated the main material perfectly, but forgot everything that goes with it.
4. Ignoring Mobilization Costs
Getting to the job costs money. Setting up costs money. These are real expenses that must be in your bid.
5. Using Old Pricing
Construction material prices are volatile. Lumber, concrete, and steel can swing 1030% in a matter of months. Always check the latest market price.
Domain:
Data
Industry:
Construction
•
Engineering
Language:
English
FAQ
What software do you use for takeoff?
For simple and straight-forward plans, I use manual calculation or excel. For more complicated plans, I use Bluebeam Revu, especially to determine areas and volumes.

