I will design a permit ready stormwater plan with erosion and sediment control
Civil 3D Drafting Site Plans Grading Drainage Takeoffs Permit Ready Estimate
About this Gig
Runoff, erosion, or a missing SWPPP can get a site fined or shut down before work starts. I design permit ready stormwater management plans with erosion and sediment control built to meet US municipal and state requirements.
Whether you're a contractor breaking ground, a developer managing multiple lots, or a property owner dealing with a drainage or erosion problem, I create clear plans showing best management practices, sediment control, and stormwater flow that inspectors expect to see.
What you get:
- Stormwater management plan tailored to your site
- Erosion and sediment control layout with BMPs
- SWPPP documentation for your jurisdiction
- Drainage flow diagram and runoff analysis
- Submission ready documents (PDF + DWG)
Skip proper erosion control and you risk fines and a stalled project; get it right and your site stays compliant and on schedule.
Note: design and drafting only, not stamping or approval. If required, I'll prepare it ready for your engineer's review and signature.
Contact Me Before Ordering so I can review your site and permit requirements.
Project scale:
Building
Building type:
Residential
•
Commercial
Material speciality:
Concrete
•
Wood
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
Other Building Engineering Services I Offer
FAQ
My stormwater plan was rejected can you fix it based on the reviewer's comments?
Yes. Send me the review comments along with your original plan, and I'll address the specific items flagged rather than rebuilding the whole package from scratch, which keeps your resubmittal fast.
Do you include the sediment basin sizing and peak discharge calculations, or just the drawings?
Calculations are included sediment basin sizing and pre/post-development peak discharge figures are typically required alongside the drawings for full permit approval.
What's the difference between an erosion control plan and a full stormwater/SWPPP package?
An erosion control plan covers BMP placement during construction; a full stormwater/SWPPP package adds the grading, drainage routing, calculations, and long-term post-construction stormwater management your county may also require.
How do you handle BMP phasing across construction stages?
I lay out BMPs by phase initial clearing/grading, active construction, and final stabilization so the plan shows exactly which controls go in first and what changes as work progresses, matching what reviewers expect to see.
