I will provide construction estimate, material take off for construction jobs
Construction Estimator Civil Engineer
About this Gig
We are providing you take-offs & Pricing for the work includes:
- Architectural Drawings
- Demolition Drawings
- Structure Drawings
- Civil Drawings
We are dealing with the departments in NewYork, USA such as SCA, DASNY, DDC, UFSD, CUNY, SUNY,NYCHA
Following CSI divisions are covered by us:
Division-1 General Conditions
Division-2 Site Construction
Division-3 Concrete
Division-4 Masonry
Division-5 Metals
Division-6 Woodwork
Division-7 Thermal & Moisture
Division-8 Doors & Windows
Division-9 Finishes
Division-10 Special Items
Division-11 Equipment
Division-12 Furnishing
Division-31 Earthwork
Division-32 Exterior Improvements
Following are the benefits of working with us:
- Get a detailed quantity takeoff
- Reduce the workload on in house estimators
- Compare in-house estimates with our estimate to eliminate errors and omissions
- See takeoff separated by each CSI division, get a detailed scope of work for each division
1 reviews for this Gig
| (1) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Recommend to a friend
- Service as described
Sort By
E elischneider416

United States
Ongoing collaborationExcellent!
$200-$400
Price
Helpful?
1 reviews for this Gig
| (1) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Recommend to a friend
- Service as described
Sort By
E elischneider416

United States
Ongoing collaborationExcellent!
$200-$400
Price
Helpful?

