I will build a power apps canvas or model driven app for your team


About this gig
Your team works in spreadsheets, paper forms or an old database, and nobody really trusts the numbers anymore. A Power App replaces that with an application your people actually use, on their phone or in a browser, connected to the data you already have in Microsoft 365.
I build canvas apps and model-driven apps on the Microsoft Power Platform. Eleven years in IT, six on CRM and Power Platform projects in banking, commercial real estate and luxury.
WHAT YOU GET
A working app, not a prototype. Screens built around how your team actually works, connected to SharePoint, Excel, Dataverse or Dynamics 365. Validation rules so bad data never gets in. Mobile layout when you need it. Power Automate flows for approvals and notifications. A handover call, written documentation, and the solution file so the app is yours.
TYPICAL PROJECTS
Inspection and site visit forms with photos. Equipment or stock tracking. Request and approval workflows. Replacing a shared Excel file that three people edit at once. A simple front end for data that already lives in Dynamics 365.
Not sure which package fits? Message me with your process and I will tell you what it needs.
Get to know saad ben
Dynamics 365 CRM Expert, Software Engineer
- FromFrance
- Member sinceSep 2026
- Avg. response time2 days
Languages
English, French
Other Software Development Services I Offer
FAQ
Do I need a Power Apps or Dynamics 365 licence?
If the app only uses SharePoint, Excel or Outlook, your existing Microsoft 365 licence is usually enough. If it uses Dataverse or premium connectors such as SQL Server, you need a Power Apps licence per user. I tell you which one you need before we start, so there are no surprises.
Can the app connect to the systems we already use?
SharePoint, Excel, SQL Server, Dataverse, Dynamics 365, Outlook and Teams are standard. For anything else I check whether a connector exists, or build a custom one using Azure and C#. Tell me the system before you order and I will confirm.
What happens after you deliver the app?
You get the solution file, written documentation and a handover call, so your own team can maintain the app without me. If you would rather I keep looking after it, I can quote a small monthly support package separately.
