I will nec electrical load calculation, panel schedule, and load analysis for permit
About this Gig
Are you looking for accurate, code compliant NEC electrical load calculations and panel schedules ready for permit submission? You're in the right place.
I'm a professional electrical designer with hands on expertise in NEC 2020/2023 residential, commercial, and industrial load calculations. I deliver clean, permit-ready panel schedules that inspectors approve the first time.
What you get:
- NEC compliant load calculation (Article 220)
- Panel schedule with branch circuit breakdown
- Main & sub panel sizing recommendations
- Demand load & short circuit analysis
- Solar PV & EV charger load integration
- AutoCAD DWG + PDF ready for AHJ submission
I've worked on residential, multi family, commercial tenant improvements, and industrial facilities. Every deliverable follows NEC standards and is formatted to meet your local building department's requirements.
Fast turnaround. Clear communication. Permit ready every time.
Message me before ordering to get the best result
FAQ
What information do I need to provide?
Just share your floor plan or fixture/appliance list, service voltage (120/240V or 3 phase), and your local code cycle (NEC 2020 or 2023). I'll handle the rest.
Will this be accepted by my local building department?
Yes. All calculations follow NEC Article 220 and are formatted for AHJ (Authority Having Jurisdiction) submission. If your inspector requests any revision, I'll fix it at no charge.
Do you handle solar PV and EV charger loads?
Absolutely. I include solar PV interconnection load analysis and EV charger (EVSE) demand calculations per NEC 625 and 705 as part of the Standard and Premium packages.
What file formats do you deliver?
PDF for all packages. Standard and Premium also include AutoCAD DWG files. If you need a different format, just let me know before ordering.
Can you work on commercial or industrial projects?
Yes commercial tenant improvements, warehouses, manufacturing facilities, and multi panel systems are all covered under the Premium package. Message me with your project details first.
