I will build cross chain bridge between solana and evm

5.0
5.0

Serbia

I speak English

107 orders completed

Blockchain Developer

Hello everyone! Experienced blockchain developer adept at designing, implementing and maintaining DApps and smart contracts on Evm, Solana, Monad, Tron, TON, Sui. I have been built DEX/CEX system, NFT...

Level 2

Has met high performance criteria and has a proven track record for meeting client expectations.

About this Gig

⭐️⭐️⭐️ Dear Client ⭐️⭐️⭐️


Thanks for visiting to my Gig.

Do you need a powerful and secure cross-chain bridge to enable seamless token or data transfers between blockchains? Look no further!


I specialize in building custom cross-chain bridges that connect major blockchain ecosystems like Ethereum, BNB Chain, Solana, Polygon, Avalanche, SUI, and more enabling interoperability and expanding your project's reach.


What I Offer:

  • Custom Cross-Chain Bridge Development
  • Token Transfers (ERC-20, SPL, BEP-20, etc.)
  • NFT Bridging (ERC-721 / 1155 compatible)
  • Wrapped Token Creation & Management
  • Smart Contract Development (Solidity, Rust, Move)
  • Chain-to-Chain Messaging (LayerZero, Wormhole, Axelar, custom)
  • Integration with Wallets (Metamask, Phantom, WalletConnect)
  • Security-Focused Architecture & Auditing Guidance
  • Deployment & Full Testing on Testnet/Mainnet


Supported Blockchains:

  • Ethereum / BNB Chain / Polygon / Arbitrum / Optimism
  • Solana / SUI / Aptos
  • Avalanche / Fantom / Base
  • Custom EVM or Layer 1 chains (on request)


Lets connect your blockchain ecosystem!

Message me now to discuss your custom cross-chain bridge requirements.

Purpose:

DeFi

Gaming

Dao

NFT

Smart Contracts

Programming language:

JavaScript

Node.js

React

Rust

Solidity

Expertise:

APIs

Backend

Blockchain development

Keep your assets and information safe

Cryptocurrency services focus solely on developing and programming. Never share sensitive information or private keys with others.

My Portfolio

Reviews

2 reviews for this Gig
5.0

(2)
(0)
(0)
(0)
(0)
Rating Breakdown
  • Seller communication level
    5
  • Quality of delivery
    5
  • Value of delivery
    5
Sort By
Most relevant
  • J
    image-docs

    jenkinsdylan86

    Repeat Client

    US

    United States

    5

    Dragan is an excellent and sophisticated telegram mini game developer. His work has far exceeded my expectations. I am very satisfied with his work. I hope to continue working with him in the future and highly recommend Dragan to anyone who wants to develop telegram mini games.

    $400-$600

    Price

    2 days

    Duration

    Helpful?
    Yes
    No
  • B

    bryanneil674

    US

    United States

    5

    I had a great time working with Dragan on the Kamabla tapping game and am very happy with the results. The entire process from planning to execution was handled with the utmost professionalism. It was delivered ahead of schedule and the final product exceeded my expectations. If you are looking for a...

    $200-$400

    Price

    2 days

    Duration

    Helpful?
    Yes
    No
Reviews

2 reviews for this Gig
5.0

(2)
(0)
(0)
(0)
(0)
Rating Breakdown
  • Seller communication level
    5
  • Quality of delivery
    5
  • Value of delivery
    5
Sort By
Most relevant
  • J
    image-docs

    jenkinsdylan86

    Repeat Client

    US

    United States

    5

    Dragan is an excellent and sophisticated telegram mini game developer. His work has far exceeded my expectations. I am very satisfied with his work. I hope to continue working with him in the future and highly recommend Dragan to anyone who wants to develop telegram mini games.

    $400-$600

    Price

    2 days

    Duration

    Helpful?
    Yes
    No
  • B

    bryanneil674

    US

    United States

    5

    I had a great time working with Dragan on the Kamabla tapping game and am very happy with the results. The entire process from planning to execution was handled with the utmost professionalism. It was delivered ahead of schedule and the final product exceeded my expectations. If you are looking for a...

    $200-$400

    Price

    2 days

    Duration

    Helpful?
    Yes
    No

Related tags