I will design esp32 stm32 iot circuit, schematic and production pcb

5.0
5.0

India

I speak English, Hindi, German, French

42 orders completed

Sr Electronics Product Design Expert , Altium PCB Circuit Hardware Gerbers

I help startups, inventors, and product teams turn electronic ideas into robust, production-ready hardware. 100% Job Success | Top Rated Plus | 11+ years | 500+ assignments | 11,000+ Upwork hours | P...

Level 2

Has met high performance criteria and has a proven track record for meeting client expectations.

About this Gig

I design production-ready ESP32/STM32 IoT PCBs for real products, not just dev boards. You get reliable WiFi/BLE electronics from idea to schematic, PCB layout, and BOM, optimized for low power, stable connectivity, and easy manufacturing.

I've designed IoT sensor nodes, gateways, data loggers, wearables, and industrial controllers using ESP32, STM32, and other ARM MCUs, following DFM and EMI/EMC-aware practices.


What I deliver

  1. Circuit & schematic design around ESP32 / STM32
  2. PCB design (26 layers) with good SI/PI
  3. Power: battery / USB / DC, charging & protection
  4. Integration of WiFi/BLE, sensors, RS-485, CAN, relays, displays
  5. BOM with supply-friendly parts
  6. Fab package: Gerbers, drill, pick & place, assembly docs


Tools: Altium Designer (main), plus KiCad or EasyEDA.


Typical work: smart home & building automation, industrial automation & robotics, agri-tech and environmental monitoring, medical devices and wearables, consumer electronics (wireless mouse PCBs, keyboards, audio gadgets, GPS/asset trackers), automotive/EV accessories and other embedded systems.


Send me your idea, block diagram or existing design and Ill suggest the right package.

Specialization:

Circuit design

Schematics

Layout

Footprint

File format:

Gerber

STEP

BRD

SCH

PDF

Software:

Allegro

Altium Designer

Eagle CAD

EasyEDA

KiCad

PSpice

Interface:

HDMI

I2S

USB

SPI

I2C

PCIe

Wi-Fi

BLE

BT

GSM/GPRS

LTE

CAT-M1

My Portfolio

Reviews

4 reviews for this Gig
5.0

(4)
(0)
(0)
(0)
(0)
Rating Breakdown
  • Seller communication level
    5
  • Quality of delivery
    5
  • Value of delivery
    5
Sort By
Most relevant
  • M
    image-docs

    mlarun55

    IN

    India

    Ongoing collaboration
    5

    Very good seller understanding the things in detail

    $50

    Price

    2 days

    Duration

    Helpful?
    Yes
    No
  • M
    image-docs

    mcfwcharles

    US

    United States

    5

    Had a great meeting, looking forward to the results!

    $50

    Price

    7 weeks

    Duration

    Worksample image
    Helpful?
    Yes
    No
  • B
    image-docs

    bradels1

    LU

    Luxembourg

    5

    Responsive and understandable in the moment.

    $50-$100

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
  • A

    adnanazam77

    OM

    Oman

    Ongoing collaboration
    5

    Very satisfied.

    $50

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
Reviews

4 reviews for this Gig
5.0

(4)
(0)
(0)
(0)
(0)
Rating Breakdown
  • Seller communication level
    5
  • Quality of delivery
    5
  • Value of delivery
    5
Sort By
Most relevant
  • M
    image-docs

    mlarun55

    IN

    India

    Ongoing collaboration
    5

    Very good seller understanding the things in detail

    $50

    Price

    2 days

    Duration

    Helpful?
    Yes
    No
  • M
    image-docs

    mcfwcharles

    US

    United States

    5

    Had a great meeting, looking forward to the results!

    $50

    Price

    7 weeks

    Duration

    Worksample image
    Helpful?
    Yes
    No
  • B
    image-docs

    bradels1

    LU

    Luxembourg

    5

    Responsive and understandable in the moment.

    $50-$100

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
  • A

    adnanazam77

    OM

    Oman

    Ongoing collaboration
    5

    Very satisfied.

    $50

    Price

    1 day

    Duration

    Helpful?
    Yes
    No