I will design civil site utility layout and erosion control plans
LID site design bioretention cells, vegetated swales, permeable pavers, roof l
About this Gig
Struggling with site permit delays or municipal rejections?
I create permit ready civil site utility layout drawings and Erosion and Sediment Control (ESC) plans in Autodesk Civil 3D designed to pass local city and county engineering reviews on your first submittal. With extensive civil drafting experience on commercial and residential land development projects.
What You Get in This Gig:
- Complete Site Utility Layout: Sanitary sewer, storm drainage, and water main distribution networks with dynamic Civil 3D pipe network profiles.
- Clash Detection: Vertical clearance checks between underground utilities to prevent costly field rework.
- Comprehensive ESC Plans: Limits of Disturbance (LOD) boundaries, sediment basin sizing, and BMP details (silt fences, inlet protection, construction entrances).
- Phased Submittals: Initial grading phase and construction phase drawings ready for permit review.
Whether you need a full storm water management plan or an erosion control layout, every sheet is engineered for rapid approval.
Contact Me Before Ordering to discuss your project scope!
Project scale:
Building
Building type:
Residential
•
Commercial
•
Industrial
Material speciality:
Concrete
•
Wood
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
Will these drawings pass my local city or county permit review?
Yes. All utility layout plans and Erosion and Sediment Control (ESC) drawings are drafted in accordance with standard municipal permit guidelines and local BMP specifications for formal submittals.
What software do you use to design the pipe networks and profiles?
I use Autodesk Civil 3D to model dynamic gravity and pressure pipe networks (sanitary sewer, storm drainage, water main layout) and generate accurate pipe network profiles.
What happens if the city plan reviewer requests revisions on my ESC plan?
Revisions stemming from municipal review comments regarding the ESC plan, LOD boundaries, or BMP details are covered based on the revision policy of your selected package tier.
Do you include sediment basin design and sizing in the ESC drawing?
Yes. In the Standard and Premium packages, temporary sediment traps and sediment basin design details are sized based on your site acreage and local runoff storage criteria.
How do you handle underground utility crossings and vertical clearances?
I perform Civil 3D clash detection between crossing pipe networks to verify vertical clearances and minimum cover requirements prior to finalizing sheet profiles.
