I will create construction project schedules using primavera p6
About this Gig
Need professional construction planning and scheduling support using Primavera P6?
I have nearly 5 years of experience as a Planning Engineer, working on construction projects for major clients, including Saudi Aramco and Saudi Energy Company (SEC).
MY SERVICES:
Construction Planning and Scheduling
Primavera P6 Schedule Development
Work Breakdown Structure (WBS)
Activity Sequencing and Relationships
Critical Path and Float Analysis
Baseline Preparation and Schedule Updates
Daily, Weekly and Monthly Progress Reports
Planned vs. Actual Progress Monitoring
Earned Value Management (PV, EV, AC, SPI, CPI, SV, CV)
S-Curve Preparation and Analysis
Project Delay Analysis and Recovery Plans
Resource and Cost Loading
Project Forecasting and Performance Monitoring
Gantt Charts, XER Files and Excel Reports
My focus is on accurate planning, reliable progress monitoring, professional reporting, and timely delivery.
Contact me before ordering to discuss your requirements.
Domain:
Consulting
Industry:
Engineering
Language:
English
FAQ
What information do you need to prepare a construction project schedule?
I need your project BOQ, scope of work, drawings, project duration, start date, specifications, and any available activity list or project documents.
Can you create a complete construction schedule from scratch?
Yes. I can develop a complete Primavera P6 schedule, including WBS, activities, durations, relationships, milestones, critical path, and Gantt chart.
Can you update an existing Primavera P6 schedule?
Yes. I can update your existing schedule with actual dates, remaining durations, activity progress, schedule performance, and planned versus actual comparisons.
Do you provide daily, weekly, and monthly progress reports?
Yes. I prepare professional daily, weekly, and monthly progress reports, including work completed, planned versus actual progress, delays, and upcoming activities.
Can you perform Critical Path Method (CPM) analysis?
Yes. I can identify critical and non-critical activities, analyze total and free float, and evaluate their impact on project completion.
Do you provide Earned Value Management (EVM) analysis?
Yes. I calculate PV, EV, AC, SPI, CPI, SV, and CV to evaluate project schedule and cost performance using available project data.
Can you prepare project S-curves?
Yes. I can prepare planned, actual, and earned progress S-curves to monitor and compare project performance.
Do you provide project delay analysis and recovery schedules?
Yes. I can analyze schedule delays, identify affected critical activities, evaluate schedule deviations, and prepare recovery plans.
Will you provide the editable Primavera P6 file?
Yes. I can provide the native Primavera P6 XER file along with PDF Gantt charts and Excel reports, depending on your selected package.
Can you work on different types of construction projects?
Yes. I can assist with building construction, roads, infrastructure, civil works, and other construction-related projects.

