I will write your rams, risk assessments and method statements
Practical tools and systems built by a UK chartered professional
About this Gig
I write Risk Assessment and Method Statement (RAMS) documents that are detailed enough to satisfy a client or principal contractor, and clear enough that your team will actually read and follow them on site.
Each RAMS is built around your specific task, sequence of work, and site conditions not a recycled generic template with the company name swapped out.
Why work with me:
- Structured hazard/control tables with likelihood, severity, and residual risk ratings
- Step by step method statements matched to your actual sequence of work
- PPE, emergency procedures, and sign off sections included as standard
- Quick turnaround for time sensitive site starts
Business type:
Startups
•
Nonprofit organizations
Industry:
Construction
•
Engineering
•
Events planning
FAQ
Can you tailor this to my type of work?
Yes — I can adapt the examples and controls to suit your specific trade or activity
Are these suitable for client or principal contractor submission?
Absolutely. They’re designed to meet CDM expectations and client review standards.
Can I reuse these templates for future projects?
Yes — once purchased, they’re fully reusable for your business.

