I will build a feasibility study and capex opex model for your environmental project
Ingeniero Ambiental, EIA, efluentes y gestion de residuos
About this Gig
Turn your environmental project into numbers that investors and managers understand. I build technical-economic feasibility studies for waste treatment, water and wastewater, renewable energy and circular-economy projects.
Example: shared medical-waste treatment plant for 3 clinics, with about 44% lower cost per kg than the market and payback in about 13 months, including a phased investment plan and regulatory roadmap.
What you get:
- Technical scope and equipment sizing assumptions
- CAPEX and OPEX with supplier references
- Savings, cash flow and payback (Excel model you can edit)
- Scenarios (base and pessimistic)
- (Premium) feasibility report and investor one-pager or short pitch deck
Message me before ordering with your project idea, location and the data you have. I work in English and Spanish.
Hablo español: podés escribirme y recibir los entregables en español o en inglés.
Service type:
Renewable Energy Projects
Industry:
Business services & consulting
•
Energy
•
Environmental
