I will create project schedule and planning of the project
Project Planning and Scheduling Engineer, Primavera P6, Project Controls
About this Gig
Need a professional project schedule that gives you a clear view of activities, deadlines, critical tasks, and progress?
I can turn your scope, BOQ, drawings, or requirements into a structured project programme using Primavera P6. Whether you need a new programme, an update to an existing one, or better progress tracking, I will tailor the work to your project.
WHAT I CAN DO
Primavera P6 scheduling
WBS and activity development
Activity sequencing and logic
Calendars and milestones
Gantt charts and timelines
Critical path and float analysis
Baseline programme
Resource and cost loading
Planned vs actual tracking
Schedule updates
S-Curve and Cash Flow
Recovery and lookahead plans
Excel reports and dashboards
Earned Value Management
TOOLS
Primavera P6 | MS Project | Excel | Google Sheets
PROJECT EXPERIENCE
Construction | Civil | MEP | EPC | Oil & Gas | Infrastructure | Industrial | Engineering
For large or detailed assignments, please contact me before ordering so I can review your requirements.
Clear Planning. Better Control. Successful Delivery.
Domain:
Business
Industry:
Construction
•
Engineering
Language:
English
My Portfolio
FAQ
What software do you use?
I primarily use Primavera P6 for professional project planning and scheduling. I can also work with Microsoft Project and Excel depending on the project requirements.
Can you create a schedule from my BOQ?
Yes. I can develop the WBS, activities, durations and schedule logic based on your BOQ and project scope.
Can you create a baseline schedule?
Yes. I can develop and baseline the project schedule in Primavera P6 according to the approved project requirements.
Can you provide the editable Primavera P6 file?
Yes. Editable P6 files can be included depending on the selected package.
Can you resource-load the schedule?
Yes. Resource loading and resource assignment can be included in the Standard/Premium package or provided through a custom offer.
Can you cost-load the schedule?
Yes. Cost loading and budget distribution can be provided when the required cost/BOQ information is available.
Can you create an S-Curve?
Yes. I can prepare planned progress, cumulative progress and S-Curve reports using Primavera P6 and Excel.
Can you update an existing Primavera schedule?
Yes. I can update schedules based on actual progress, remaining duration, actual dates and project status information.
Can you create a recovery schedule?
Yes. I can analyze the schedule and prepare a recovery/revised programme based on the available project information.
Can you work with construction and EPC projects?
Yes. I can work with construction, civil, MEP, engineering, industrial, EPC and oil & gas project schedules.

