I will do hazop, sil and lopa task and report, pha pro
About this Gig
Hi, Welcome to my Gig
I've 5 years of experience in offshore and onshore oil and gas production and processing facilities, petrochemicals and refineries, working as Risk & Safety Engineer in a consultancy Firm, dealing with ADNOC projects.
My experties are:
- TOR preparation
- HAZOP P&ID markup
- HAZOP worksheet preparation / Pasting data on PHA Pro software from worksheet.
- SIF loop identification
- SIL/LOPA sheets preparation for the workshop
- Recommendations & Report writing.
- Draft report
If you had any confusion about the Scope of work, just ping me.
Regards
Mudassir
Technology:
Excel
•
Other
FAQ
What is the primary goal of a HAZOP study?
The main aim of a Hazard and Operability Study (HAZOP) is to systematically identify potential hazards and operational issues within a process system to enhance safety.
How does SIL differ from other safety integrity levels, and why is it crucial in safety instrumented systems?
Safety Integrity Level (SIL) quantifies the reliability of safety instrumented systems (SIS) in reducing risk. It ranges from SIL 1 to SIL 4 and is critical as it measures the system's ability to prevent or mitigate hazardous events.
What are the primary nodes typically examined in a HAZOP study, and why are these nodes crucial?
Nodes examined in a HAZOP study include equipment, systems, and processes susceptible to deviations from the intended design. These nodes are pivotal as they represent potential areas where deviations might lead to hazards or operability issues.

