I will build a construction schedule gantt chart using primavera p6
About this Gig
I will create a complete Primavera P6 project schedule covering all planning aspects.
My service includes:
- Work Breakdown Structure (WBS)
- Milestones and Activity Scheduling
- Resource Assignment
- Cost Loading
- Baseline Assignment
- S-Curve Generation
- Full compliance with the 14 Planning Checkpoints in Primavera P6
Whether it's a construction, infrastructure, or MEP project, Ill deliver a professional, logically linked schedule tailored to your scope.
Domain:
Consulting
Industry:
Construction
•
Engineering
Language:
English
FAQ
What do you need from me to start the schedule?
I need your project scope, BOQ or activity list, project duration, milestone targets, and any specific requirements for WBS, resources, or calendars.
Will you assign resources and cost to each activity?
Yes, I will assign labor, material, and equipment resources along with cost loading as per your requirement.
Will you include all 14 planning checks in Primavera P6?
Yes, I ensure the schedule passes all 14 planning checks to make it professional and ready for approval.

