N Shahriar
PMO Specialist, Project Scheduling, EVM, Construction Project Controls
Skills

See my services


Portfolio
Work experience
Senior Executive (PMO)
Edison Real Estate Limited • Full-time
Oct 2025 - Present • 7 mos
I am Managing the Project Management Plan, Master Schedule, and baselines for ten concurrent real estate projects. • Monitored progress, cost, and performance using EVM and variance analysis, achieving 93% schedule and budget adherence. • Controlled scope changes, revisions, and variation orders, reducing documentation delays by 18%. • Conducted risk assessments and implemented mitigation plans, preventing 90% of potential delays or overruns. • Coordinated with site teams, consultants, and contractors to resolve technical and logistical issues. • Ensured compliance with quality, safety, and HSE standards, maintaining zero Major Incident Rate (MIR). • Supported procurement, budgeting, and contract administration, contributing to 3% overall cost efficiency. • Prepared weekly and monthly analytical progress dashboards for senior management review, streamlining reporting and improving C-level decision-making cycle. • Maintained structured document control and effective stakeholder communication. Leading PMO operations for the following Projects: Edison Camillo B+G+15 20 Katha Edison Juno G+7 16 Katha Edison Elena G+M+8 5 Katha Edison Armand G+M+8 5 Katha Edison Majestic Manor G+M+8 5 Katha Edison Nueva Upcoming 5 Katha Edison Moonview Upcoming 5 Katha Edison Benvolio B+G+14 28.42 Katha Edison Amara G+8 4 Katha Edison Odessa G+8 6 Katha
Executive Engineer (Construction)
Rangs Properties Limited • Full-time
Oct 2023 - Sep 2025 • 1 yr 11 mos
Project Engineer (Acting In-Charge) Project: Rangs Ixora | Scale: 2B+G+13 | 30 Katha Duration: 15/10/2023 – 05/11/2023 & 01/07/2024 – 27/09/2025 Structural Delivery: Drove substantial structural completion, overseeing Building 01 (20 Katha) up to the 4th Floor Roof Slab Casting and Building 02 (10 Katha) up to the 11th Floor Roof Slab Casting. Foundation: Directed multi-modal execution of Cast in-situ service pile, king post pile, and sheet pile shore protection; Bracing with I- section. Supervised Mat Top with Pile Cap Foundation at −17′-0′′ and −8′0′′ elevations. Project Controls & Finance: Led project scheduling and site implementation. Managed detailed monthly materials estimation/requisition and budgeting. Prepared and processed all contractors' and vendors' bills. Specialized Works: Managed critical specialty items (basement waterproofing, micro-concreting). Implemented wastage control and ensured strict safety protocols. Supervised starting of mock apartment construction. Project In-Charge Project: Rangs T-Cube | Scale: G+9 | 6.27 Katha Duration: 06/11/2023 – 27/06/2024 Substructure Leadership: Managed the full project life cycle from initial ground-breaking arrangement. Directly supervised substructure execution: layout, excavation, I-Joist shore protection, and casting of combined footings, pedestal columns upto grade beams. Financial Control: Prepared and maintained the monthly project cash flow statement. Managed material estimating/budgeting and processed all contractors' bills. Operational Oversight: Ensured operational excellence through rigorous Quality Control (QC) and wastage control. Maintained safety and security for all site resources.