I will prepare mep quantity takeoff and boq for total mep scope
Professional Quantity Surveyor, Cost Estimator, BOQ , Cost X Expert
About this Gig
Need accurate MEP quantity takeoff and a professionally prepared Bill of Quantities (BOQ) for your construction project?
I am a Quantity Surveyor providing MEP quantity takeoff and BOQ preparation services for building construction projects. I can assist contractors, quantity surveyors, consultants, estimators and construction companies with organised quantity measurements based on the drawings and documents you provide.
My Services Include:
- Electrical Quantity Takeoff: Lighting points, power outlets, switches, distribution boards, cable quantities and other measurable electrical items shown on the drawings.
- Plumbing Quantity Takeoff: Water supply pipes, drainage pipes, sanitary fixtures, valves and associated plumbing items.
- HVAC Quantity Takeoff: Ductwork, air terminals, HVAC equipment and related measurable components shown in the drawings.
- MEP Bill of Quantities (BOQ): Structured BOQ preparation with item descriptions, units and quantities.
- Excel Measurement Sheets: Clear and organised quantity calculations for checking and review.
- Drawing-Based Measurements: Quantity extraction from available PDF drawings and schedules.
Domain:
Business
Industry:
Construction
Language:
English
•
Sinhala
FAQ
Which MEP trades do you cover?
I provide quantity takeoff and BOQ preparation for electrical, plumbing and HVAC works, subject to the available drawings and agreed scope.
Which file formats do you accept?
I can review PDF drawings and relevant schedules. Final deliverables can include Excel BOQs and measurement sheets.
Do you provide material rates and cost estimates?
These can be discussed separately. Please provide the project location, pricing basis and any required rate sources before ordering.
Can you handle large commercial projects?
Please contact me first with the drawings, project scope and deadline so I can assess the workload and provide a suitable offer.
What if some information is missing from the drawings?
I will identify unclear or missing information where reasonably possible and request clarification instead of making unsupported assumptions.