I will do quantity takeoff csi base estimation on planswift
Civil Estimation Engineer
About this Gig
- Prepare detailed quantity take-offs and Bills of Quantities (BOQs) for UAE, UK and USA residential, commercial, and mixed-use construction projects, covering structural, architectural, MEP, and electrical works in accordance with project drawings, specifications, and client requirements.
- Perform detailed material takeoffs and precise cost estimations across all major construction divisionsincluding General Construction, Concrete & Structural, Reinforcement, Formwork, Masonry, Framing & Carpentry, Thermal & Moisture Protection, Roofing, Openings, Drywall, Plaster, Flooring, Tiling, Painting, Ceilings, Waterproofing, Furnishings & Equipment, Road & Infrastructure, and full MEP systems (HVAC, plumbing, firefighting, and electrical); conduct rigorous rate analysis utilizing supplier quotations, subcontractor pricing, and project-specific cost databases to consistently deliver accurate, comprehensive, and highly competitive project estimates.
- Review architectural, structural, MEP, shop, and construction drawings along with project specifications to identify scope, quantify materials, and ensure complete and accurate project estimates.
- Prepare detailed quantity take-offs using CSI Divis
Building type:
Residential
•
Commercial
•
Institutional & public
Software:
Bluebeam
•
PlanSwift
•
Microsoft Excel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
FAQ
What is the scope of work you need estimated?
e.g., Full multi-trade estimate, or specific trades like Concrete, Openings/Finishes, or MEP only?
What files do you have available?
Please share PDF/CAD drawings including Architectural, Structural, or MEP plans, along with any project specification documents.
Do you have a specific template or format you want me to use?
Standard CSI MasterFormat breakdown, a specific client-provided Excel sheet, or a standard Bill of Quantities (BOQ)?
What is your required deadline for this estimate?
Please specify your exact bid submission date or required deadline when submitting the project.

