I will prepare risk assessment and method statement rams documents
Facilities and Workplace Safety Specialist, SOPs and Risk Assessments
About this Gig
Permit-to-work RAMS your main contractor will accept, drafted by a practising Singapore Fire Safety Manager.
Delivered in 3-5 days in Word and PDF, built around your sequence of works, not a generic template.
Each document covers task-by-task hazard identification, risk ratings before and after controls, control measures, PPE, permits and emergency arrangements, as your reviewer expects.
What you get:
- Risk assessment and method statement in Word and PDF
- Hazard identification and risk ratings before and after controls
- Clear, plain-English wording your team can actually follow
- One revision round included
I work in facilities and workplace safety at a manufacturing site in Singapore, where risk assessments, audits and safety documentation are part of my day-to-day work. I help SMEs and subcontractors especially construction and M&E teams get their documentation right, fast, so deadlines are not held up by paperwork.
Send me the details of your work activity and I will confirm the scope first.
Need the matching emergency plan or evacuation diagram too? See my Emergency Response Plan and evacuation floor-plan gigs.
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
What format will I receive?
Word and PDF, ready to submit to your main contractor, client or auditor. One revision round is included in every package.
Can you match my main contractor's template?
Yes — send the template or an example, and I will follow its structure and headings where your details allow.
What do you need from me to start?
Your scope of work / trade package, site location, and any client or main-contractor template you must follow. Photos or drawings help but aren't required. Message me before ordering if you're unsure — I'll confirm the right package first.
Which standards do you write to?
Documents are structured around ISO 45001 and the hierarchy of controls, and can be aligned to Singapore WSH, UK CDM/HSE, OSHA or your client's format — tell me which applies to your project.
What formats do I receive?
Editable Word + PDF as standard; the risk register can also be supplied in Excel on the Standard package and above.
Is this a generic template?
No. Every RAMS is written for your specific activity, hazards and controls — not a renamed sample. One revision round is included to fold in your reviewer's comments.
Can you sign off / approve my RAMS?
This is a drafting service. Final approval stays with your organisation's designated approver, as it should — I write it so their review is quick.

