I will create a bim revit model with complete material takeoff and quantities
About this Gig
Accurate quantities save projects. Guesswork costs them.
I'm an architect with over 15 years of experience across nearly 400,000 m² of designed projects residential towers, hospitals, social housing, and commercial buildings. I build Revit models that don't just look right: they count right. Every wall, slab, door, window, and finish tied to schedules you can actually use for budgeting and procurement.
What I work from:
- Existing Revit models
- AutoCAD or PDF plans (I model and quantify from scratch)
- Hand sketches with dimensions
What I deliver:
- Revit model with materials and components properly assigned
- Quantity schedules exported to Excel organized by floor, zone, or element type
- Material takeoff report in PDF
- Breakdown by category: structure, finishes, openings, MEP rough-ins (Basic excludes MEP)
Why this matters:
- Quantities extracted directly from the model no manual counting, no spreadsheet errors
- Organized by the categories your budget team actually uses
- Built by someone who has worked on site and knows what gets measured and why
Need quantities for a permit submission, a budget estimate, or a contractor package? Let's talk.
Model it once. Quantify everything.
Project scale:
Building
Material speciality:
Concrete
•
Steel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
FAQ
Do I need to send you a Revit model, or can you work from PDF plans?
Both. If you have a Revit model, I extract quantities directly. If you only have PDF or CAD plans, the Premium package includes building the model first, then running the full takeoff.
What categories does the takeoff include?
Concrete, masonry, finishes (floors, walls, ceilings), doors and windows, and structural elements. MEP rough-ins are included in Standard and Premium upon request.
Can the Excel output match our company's budget template?
Yes — send me your template before ordering and I'll format the schedules to fit it.
How accurate are BIM-based quantities vs. manual takeoffs?
Significantly more accurate, since every element is counted from the model geometry — no manual reading of drawings or estimation. Changes in the model update the quantities automatically.

