I will write hse risk assessments and method statements for your project


About this gig
Need an HSE document that is clear, practical and ready to use on site? I write risk assessments and method statements for construction, industrial and facilities work.
I am a QHSE and mechanical engineer with several years of hands-on HSE experience on construction and industrial projects, holding NEBOSH IGC, IOSH, OSHA and ISO 45001 training.
What you get:
- Activity hazard identification with risk rating before and after controls
- Practical control measures and responsible roles
- Step-by-step method statement (Standard and Premium)
- Toolbox talks and inspection checklist (Premium)
- Editable Word file plus PDF, in clear English
How it works:
1. Send me the activity, location and any company template.
2. I prepare the draft and send it within the delivery time.
3. You get revisions to match your site.
Basic: one activity risk assessment. Standard: risk assessment plus method statement. Premium: project pack with several activities, toolbox talks and checklist.
Message me before ordering if your work is not listed. I will confirm scope and give you a clear answer.
Get to know Hesham R.
HSE Engineer for Risk Assessments and Method Statements
- FromEgypt
- Member sinceNov 2026
Languages
Arabic, English

