I will create primavera p6 and ms project construction schedules
I am a Professional Project managment and Planning Engineer
About this Gig
Hi, greetings!
Need a professional Primavera P6 or MS Project schedule for your construction project or tender?
As a Planning & Project Management Engineer, I develop audit-ready, CPM-based Work plan adhering to international standards (AACE, PMI, FIDIC). From tender work plans to complex baselines, I build robust, logically linked programs.
What I Offer:
- WBS Structure: Hierarchical breakdown to work package levels
- CPM Network Logic: Predecessors, successors, lead/lag optimization & Critical Path
- Milestones: Key contractual & project handover dates
- Resource & Cost Loading: Cash flow S-curves & histograms
- Project Controls: Baselines, variance tracking & look-ahead schedules
- Work Plan Updates: Delay analysis, recovery plans & progress monitoring
Deliverables:
- Primavera P6 native source file (.XER)
- Microsoft Project native file (.MPP)
- Printable Gantt Chart (PDF)
- Tabular schedule & activity reports (Excel)
Why Choose Me?
- Zero open ends, realistic float, and clean network logic
- Real-world construction & infrastructure experience
- Dedicated post-delivery support & revisions
Please message me with your project scope, drawings, or BOQ before ordering!
Domain:
Consulting
Industry:
Construction
•
Engineering
Language:
Arabic
•
English
•
Urdu
My Portfolio
FAQ
1. What information do you need to start the project?
I need project scope, BOQ (if available), drawings, timeline requirements, and any client-specific scheduling constraints.
2. Which software will you use?
I will use Primavera P6 as well as MS project for scheduling and CPM-based project planning.
3. Will you provide a complete project schedule?
Yes, I will deliver a complete project schedule including WBS, activities, logic links, milestones, and baseline plan.
4. Can you update an existing schedule?
Yes, I can review, correct, and update your existing Primavera P6 and Ms Project schedule as per project progress or requirements.
5. Will I receive the editable Primavera file?
Yes, you will receive the .XER file, MPP (Primavera P6 ,Ms Project editable format) along with PDF/Excel outputs if required.
6. Can you handle large and complex construction projects?
Yes, I specialize in large-scale construction planning, CPM scheduling, and project control systems.
7. Do you include resource or cost loading?
Yes, resource and cost loading are included in Standard and Premium packages (if required).
8. How long does it take to complete a schedule?
Delivery time depends on project size but typically ranges from 2 to 7 days.
9. Can you ensure logical sequencing and critical path?
Yes, all schedules are developed with proper CPM logic and critical path analysis.
10. Can you ensure logical sequencing and no open ends in the schedule?
Yes. Every activity (except the project start and project finish milestones) is tied to a valid predecessor and successor. I audit the schedule to eliminate dangling logic and unrealistic lead lag relationships.

