I will convert, draw, and digitize your project plans in autocad


Level 1
Gig Summary
About this gig
Looking for flawless, professional CAD drafting without geometric errors? I will digitize your hand sketches, PDFs, or old blueprints into highly accurate AutoCAD files.
Technical Guarantees:
- Precision & Cleanliness: I draw strictly using continuous Polylines. Zero duplicated lines, overlapping elements, or open joints.
- Absolute Layer Organization: Every element (walls, dimensions, furniture, millwork) is strictly classified into clean, properly named layers for effortless future editing.
- Print-Ready Files: Precise scale setup and visual layout optimization for direct printing.
Services Offered:
- 2D floor plans (furnished and dimensioned).
- Elevations, technical sections, and wall details.
- Technical layouts (electrical points, lighting).
Note for larger projects: For larger spaces, please send me a direct message for a custom milestone quote based on square meters.
Exclusions:
- This is a drafting service only; it does NOT include architectural, interior, or structural design from scratch. The client must provide the source data.
- 3D modeling and photorealistic rendering are excluded from this offer.
*Please message me before ordering to discuss your project requirements.*
Service verification and delivery style preference
Fiverr does not screen freelancers in this category. Please verify qualifications and discuss requirements with the freelancer before ordering, including any preferences regarding the use of AI tools.
Get to know Rosserly F.
Interior Designer, Technical Documentation, 3D Visualization
Level 1
- FromDominican Republic
- Member sinceNov 2020
- Avg. response time1 hour
- Last delivery3 days
Languages
English, Spanish
My Portfolio
Other Architecture & Interior Design Services I Offer
FAQ
My space is larger than 10 m² (108 sq. ft.), how is the price calculated?
The price starts with the package base cost plus an additional rate per extra square meter according to our studio's technical specialty rates. Message me with your total square meters for a custom offer.
What happens if I need changes after using the included revisions?
Each additional and independent revision round outside the package allowance has a fixed cost of $20,00 USD.
Is the editable source file included in the package?
Packages include the final delivery in high-quality print-ready PDF format. If you need the original executable .dwg source file with all layer configurations, you can add it as a Gig Extra (additional service) for a fixed fee of $50,00 USD.
What types of projects do you work on?
I work on houses, apartments, residential buildings, hotels, offices, public/private institutions, shops (restaurants, stores, bars), and specific rooms like kitchens, bathrooms, terraces, plus furniture layouts (closets, tables, sofas, etc.)
Do you offer 3D modeling or interior design services?
Yes! I have separate gigs for 3D modeling, rendering, and interior design. Feel free to message me for more info or check my Fiverr profile to explore those services.
21 reviews for this Gig
| (21) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Quality of delivery
- Value of delivery
Sort By
W will_cowan23

United States
Rosserly was a pleasure to work with. She exceeded expectations. I will be working with her again.
$50-$100
Price
1 day
Duration

R 
Seller's Response
Helpful?J juniorartist68

Italy
Ottimo collaboratore consiglio vivamente
$50-$100
Price
10 days
Duration
R 
Seller's Response
Helpful?D drpadrino

United States
Rosserly is a true professional she came highly recommended and delivered. I am impressed that she maintained constant contact and was able to interpret a concept and designed that concept with alternates within the space provided to her. Looking forward to the next contract.
$200-$400
Price
11 days
Duration
R 
Seller's Response
Helpful?E excelenzia

Spain
Rápido y profesional, un trabajo excepcional
$50
Price
2 days
Duration
R 
Seller's Response
Helpful?E elis2001

Israel
Ongoing collaborationI had a great experience working with Rosserly. She was professional, patient, and very attentive to details. The final result was perfect and exactly what I wanted.
$50-$100
Price
13 days
Duration
R 
Seller's Response
Helpful?
21 reviews for this Gig
| (21) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Quality of delivery
- Value of delivery
Sort By
W will_cowan23

United States
Rosserly was a pleasure to work with. She exceeded expectations. I will be working with her again.
$50-$100
Price
1 day
Duration

R 
Seller's Response
Helpful?J juniorartist68

Italy
Ottimo collaboratore consiglio vivamente
$50-$100
Price
10 days
Duration
R 
Seller's Response
Helpful?D drpadrino

United States
Rosserly is a true professional she came highly recommended and delivered. I am impressed that she maintained constant contact and was able to interpret a concept and designed that concept with alternates within the space provided to her. Looking forward to the next contract.
$200-$400
Price
11 days
Duration
R 
Seller's Response
Helpful?E excelenzia

Spain
Rápido y profesional, un trabajo excepcional
$50
Price
2 days
Duration
R 
Seller's Response
Helpful?E elis2001

Israel
Ongoing collaborationI had a great experience working with Rosserly. She was professional, patient, and very attentive to details. The final result was perfect and exactly what I wanted.
$50-$100
Price
13 days
Duration
R 
Seller's Response
Helpful?

