I will do standby generator and ats permit drawings with nec load calculation
Solar BESS Design Expert 100 MW Global Portfolio
Level 2
Has met high performance criteria and has a proven track record for meeting client expectations.
Highly Responsive
Known for exceptionally quick replies
About this Gig
Need a standby generator permit approved without back-and-forth?
I prepare permit-ready drawings for home standby generators and automatic transfer switches (ATS), built to the NEC edition your city has adopted.
What I cover:
- Whole-home or essential-load ATS (service-rated or load-side)
- Generator sizing with an NEC Article 220 load calculation
- Load-shed / smart load management plans
- Air-cooled and liquid-cooled units, natural gas or LP
Your permit set can include:
- Site plan with generator location and clearances (manufacturer listing / NFPA 37)
- One-line diagram: utility, meter, ATS, generator, panels
- Conductor, breaker and conduit sizing
- Grounding and neutral-switching notes (NEC 250 / 702)
- Panel schedule and required warning labels
- Gas pipe sizing table (Premium)
- Equipment spec sheets compiled into the set
- Revisions for plan-review comments
Send me site photos, your main panel label, the generator and ATS models, and the fuel type. I will turn them into a clean PDF permit set.
Commercial or 3-phase generator? Message me for a custom offer.
Project scale:
House
Building type:
Residential
•
Commercial
•
Office & workspace
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
Other Building Engineering Services I Offer
FAQ
Whole-home vs essential circuits?
I’ll size both and show you the difference in kW.
Can it go next to the house?
That depends on the unit’s listing and local rules. I show the clearances on the site plan.
Do you size the gas line?
Yes, in Premium, based on run length and appliance load.
