I will create 3d bim 4d bim 5d bim building information modeling in revit

4.5
4.5

Pakistan

I speak Urdu, English

58 orders completed

Gig Summary

CIVIL AND STRUCTURAL ENGINEER BUILDING INFORMATION MODELING EXPERT

I'm Sibghat Abbasi, MSc Structural Engineer & BIM Specialist. Founder of SURAAJ Design Bureau, I bridge the gap between architectural vision and engineering reality. I don't just "draw"—I deliver buil...

Level 1

Has met certain performance criteria and shows strong potential in the marketplace.

About this Gig

Greetings!

As a Civil Engineer with over half a decade of experience in Building Information Modelling (BIM). I have honed my skills in creating accurate and detailed 3D models that bring your designs to life.


With my high-quality 3D visualization services, you can showcase your project with stunning 3D interior and 3D exterior renderings.


I go the extra mile by incorporating 4D BIM and 5D BIM models, adding an extra dimension of time and cost analysis to your projects, ensuring that your project is delivered on time and within budget.


My services include:

  • Building Information Modelling (3D BIM) (Upto LOD 350)
  • 3D Architectural Modelling
  • 3D Structural Modelling
  • 3D MEP
  • 4D BIM (Time & Schedule)
  • 5D BIM (Quantity & Cost Estimation)
  • Clash Detection
  • Realistic 3D Interior & Exterior Architectural Visualization


I specialize in:

  • Autodesk Revit
  • Autodesk AutoCAD
  • Oracle Primavera P6
  • Planswift
  • TwinMotion
  • Navisworks
  • Etabs

and other BIM tools, ensuring that your project is optimized for construction.


Contact me now to discuss your project details and receive a personalized quote tailored to your needs.

Let's take your projects to new heights with Building Information Modelling (BIM)!.

Project scale:

Building complex

Building type:

Residential

Commercial

Office & workspace

Material speciality:

Concrete

Steel

Delivery style preference

Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.

My Portfolio

Reviews

26 reviews for this Gig
4.5

(22)
(1)
(0)
(0)
(3)
Rating Breakdown
  • Seller communication level
    4.5
  • Quality of delivery
    4.6
  • Value of delivery
    4.5
Sort By
Most relevant
  • K

    kkamil2

    BE

    Belgium

    5

    Sibghat is exceptionnal

    $100-$200

    Price

    4 days

    Duration

    Helpful?
    Yes
    No
  • K

    kkamil2

    BE

    Belgium

    5

    Amazing as usual

    $200-$400

    Price

    7 days

    Duration

    Helpful?
    Yes
    No
  • M
    image-docs

    mauricepixgroup

    DE

    Germany

    5

    He went above and beyond to satisfy our needs

    $600-$800

    Price

    3 weeks

    Duration

    Helpful?
    Yes
    No
  • S

    sedatg05

    DE

    Germany

    5

    Very professionell and Good delivery time.

    $50

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
  • S

    sedatg05

    DE

    Germany

    5

    Thank You very muchhhh !!! Best Civil Engineer with very good skills and helpful Charakter

    $50

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
Reviews

26 reviews for this Gig
4.5

(22)
(1)
(0)
(0)
(3)
Rating Breakdown
  • Seller communication level
    4.5
  • Quality of delivery
    4.6
  • Value of delivery
    4.5
Sort By
Most relevant
  • K

    kkamil2

    BE

    Belgium

    5

    Sibghat is exceptionnal

    $100-$200

    Price

    4 days

    Duration

    Helpful?
    Yes
    No
  • K

    kkamil2

    BE

    Belgium

    5

    Amazing as usual

    $200-$400

    Price

    7 days

    Duration

    Helpful?
    Yes
    No
  • M
    image-docs

    mauricepixgroup

    DE

    Germany

    5

    He went above and beyond to satisfy our needs

    $600-$800

    Price

    3 weeks

    Duration

    Helpful?
    Yes
    No
  • S

    sedatg05

    DE

    Germany

    5

    Very professionell and Good delivery time.

    $50

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
  • S

    sedatg05

    DE

    Germany

    5

    Thank You very muchhhh !!! Best Civil Engineer with very good skills and helpful Charakter

    $50

    Price

    1 day

    Duration

    Helpful?
    Yes
    No