I will create mep civil and structural engineering 4d bim simulation in navisworks
BIM Civil Engineer: Revit, AutoCAD, MEP, Primavera P6
Level 2
Has met high performance criteria and has a proven track record for meeting client expectations.
About this Gig
Want to visualize your construction sequence in 4D?
I link your building model with a project schedule in Navisworks Timeliner to create a time based construction simulation for planning, review and presentation.
The service can include:
- Importing and organizing your supplied construction schedule
- Linking model elements to activities or work breakdown groups
- Setting construction, temporary and demolition task types where relevant
- Reviewing the sequence and correcting obvious task-to-model mismatches
- Delivering the agreed Navisworks file and simulation outputs
I can work from a Primavera P6 or MS Project schedule exported to a compatible Excel/CSV format, together with Revit, NWC or IFC model files.
Please provide the model, schedule, WBS or activity coding, planned dates and desired simulation detail. Resource-loaded planning and project controls advice are not included unless agreed separately.
Project scale:
Building
Building type:
Residential
•
Commercial
•
Hospitality
Material speciality:
Concrete
•
Steel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
Other Building Engineering Services I Offer
FAQ
Can you use a Primavera P6 schedule?
Yes. Provide a compatible Excel or CSV export with activity IDs, WBS information and planned dates.
Do you create the construction schedule?
This service focuses on linking and visualizing a schedule you provide. Schedule development and detailed planning are separate services.
Which model formats can you use?
Revit, NWC and compatible IFC models can be considered. Share the files or a sample before ordering.
Can I receive a video of the simulation?
A video or screen recording can be included if agreed in the selected package and confirmed during scope review.

