I will do construction estimating, boq and cost planning
Remote Construction Project Manager, Quantity Estimator MS Project Scheduler
Level 1
Has met certain performance criteria and shows strong potential in the marketplace.
About this Gig
Welcome! Are you looking for fast, accurate, and professional construction cost estimation and material takeoffs?
I am an experienced Construction Project Manager with hands-on site supervision and quantity estimation expertise. By combining proven construction industry practices with advanced AI-assisted data processing, I deliver high-precision Bills of Quantities (BOQ), material takeoffs, and cost estimates tailored to your project.
Whether you are preparing a bid, establishing a project budget, or planning residential, commercial, or interior fit-out works, I will streamline your project costs.
WHAT THIS GIG INCLUDES:
Comprehensive Bill of Quantities (BOQ) with logical cost breakdowns
Detailed Material Takeoffs (Concrete, Masonry, Waterproofing, Finishes, Joinery, MEP)
AI-Assisted Cost & Rate Calculations for rapid and reliable budgeting
Schedule of Values (SOV) aligned with project milestones
Organized Excel Spreadsheets with customizable cost categories
WHY WORK WITH ME?
Hands-on site management experience ensures practical, constructible estimates
Fast turnaround time using AI workflows without sacrificing attention to detail
Clear communication and customized formattin
Domain:
Business
Industry:
Business services & consulting
•
Construction
Language:
English
My Portfolio
FAQ
How does AI-powered construction estimating work?
I utilize advanced AI-driven tools alongside industry-standard software (such as Excel and specialized measurement platforms) to analyze your drawings, extract material quantities rapidly, and structure accurate cost plans. Combining AI speed with expert construction management oversight ensures hig
What documents or drawings do I need to provide to get started?
To get the most accurate estimate, please provide:0 Architectural & Structural Drawings (PDF, DWG, or ArchiCAD/AutoCAD files).0 Specifications / Scope of Work (if available).0 Location & Project Details (to apply local material and labor market rates). Any existing Bill of Quantities (BOQ) template
What formats will I receive the final deliverable in?
Microsoft Excel (.xlsx) with editable formulas for ease of customization. PDF format ready for presentation to clients, financial institutions, or contractors.
What types of projects can you estimate?
I handle a wide range of construction projects, including: Residential & Commercial fit-outs and renovations. New building construction (civil, structural, and finishing works). Specialized sub-contract works (waterproofing, joinery, ceiling & partitioning, screeding, painting, etc.).
Can you work with incomplete or preliminary drawings?
Yes! For projects in the conceptual or schematic design phase, I can prepare a Preliminary Cost Plan or Elemental Cost Estimate based on historical benchmark data, allowances, and standard unit rates to help you establish a budget early on.
Do you offer revisions if my project scope changes?
Yes, all packages include revision options. If you modify your drawings or change material specifications during the project, I can update the quantities and cost model accordingly.
1 reviews for this Gig
| (0) | ||
| (1) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Quality of delivery
- Value of delivery
Sort By
R richguy242

Bahamas
Well executed project
$50-$100
Price
1 day
Duration
T 
Seller's Response
Helpful?
1 reviews for this Gig
| (0) | ||
| (1) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Quality of delivery
- Value of delivery
Sort By
R richguy242

Bahamas
Well executed project
$50-$100
Price
1 day
Duration
T 
Seller's Response
Helpful?

